01 · Audit — ~1 week
Your highest-leverage failure mapped, a prioritized plan you own, and a concrete quote for the build. The lowest-risk way to a real number.
02 · Sprint — ~2 weeks
One visible, production-grade improvement — real code, deployed, measured. A minimum viable gate or a shipped workflow.
03 · Build — ~4–8 weeks
The full system: the eval battery, the CI gate, the automation, the runbook — owned by your team at handoff.
04 · Operate — ongoing (optional)
Measure, improve, publish. The system stays green and compounds instead of quietly decaying.
What every engagement guarantees #
- Built in your repo, your CI, your conventions — not a dependency on me.
- Every deliverable ends with a runbook and a walkthrough so your team owns it.
- Nothing is retained after handoff; access is scoped to the engagement.
- If the scoping shows I can’t help, I say so and it costs nothing.
Scope your path
Book a call and we’ll figure out which stage you actually need.